FLUIDS CONTROL
ABOVE OR BELOW THE GROUND – FROM DESIGN TO MAINTENANCE
REAL FIRE TEST EXAMPLE
Yvroud and its expertise
Yvroud and its maintenance departement
Underground Construction (tunneling)
Year | Project Name | Final Customer | Project Owner | Main features |
---|---|---|---|---|
2015-2016 | Metro line 7 Train Repair Center (La Courneuve) | RATP | RATP | - Ensure compliance of a dry riser: . design . removal of current installation . supply and installation of the new pieces of equipment . commissioning, testing and adjustments |
2014-2015 | Metro extension line 12 | RATP | RATP | - Repairs of dry risers made inside a station and also inside tunnel on service |
2014-2015 | Multiyear works Major repairs and improvements made over 2014 & 2015 the Hauts de Seine Habitat’ sites | Hauts de Seine Habitat | Hauts de Seine Habitat | - Repairs of dry risers made inside a station and also inside tunnel on service |
2013-2014 | Metro line 9 (Pont de Sèvres Station) | RATP | RATP | - Supply and installation of 280 line meters of dry risers (night work, tunnel on service) . 3 fire sockets . 1 power connection . static and dynamic tests |
2013-2014 | Metro line 12 Interstation Concorde & Assemblée Nationale | RATP | RATP | - Supply and installation of hydraulic pieces of equipment: . 480 line meters of galva tubes DN200 with Staub connection + accessories (valves, dampers, etc) . night work, tunnel on service . removal of current installation |
2012-2013 | Atomising chamber | Poudres d’Hermillon | Poudres d’Hermillon | - Installation of an oil cooling system for an atomising chamber (pumps, filters, dearator, expansion vessel, refrigerant unit) |
2012-2013 | Metro extension line 4 (Porte d’Orléans, Bagneux) | RATP | RATP | - Installation of a wastewater depletion system (PEP Romain Rolland) |
2007-2008 | Tunnel Maurice Lemaire | APRR | Egis Tunnel | - Supply and installation of 7km of fire ducts, heat insulation and tracing over 2 km - Supply and installation of fire nipples - Supply and installation of 60m of vertical piping inside ventilation shafts - Equip storage tanks, reservoir of Ste Marie with boosters and Lusse castle |
2016 | Gare RATP d’Auber | RATP | RATP | - Preparatory work and tilting dry risers networks located on the access of the platforms - Tilting, removal and installation of 430m of dry risers - Work under section 4 - asbestos |
2016 | Tunnel sous Fourvière | Grand Lyon | Groupement Maïa Sonnier | - Supply and installation of dry risers in inter-tubes |
2016 | SNCF Technicentre Atlantique | SNCF | SNCF | - Supply and installation of pipes with fittings (taps, valves, elbows, inserts, etc.) . removal of old piping system . installation of piping system HDPE Ø 75 to 100 . supply and installation of electromagnetic flow sensors |
2016 | Tunnel liaison Médiane Courbevoie | EPADESA | EGIS | - Supply and installation of dry risers in inter-tubes |
2016 | Gare de Massy Palaiseau | SNCF | SNCF | - Supply and installation of dry risers in inter-tubes |
2015 | Metro extension line 14 | RATP | RATP | - Tilting of fluid networks and smoke evacuation - Supply and installation of dry risers |
2014 | Line 14 (Puits Olympiades) | RATP | RATP | - Pire replacement station Olympiade |
2014 | Metro extension line 12 | RATP | RATP | - Supply and installation of 1150 line meters of dry risers DN100 inside a tunnel: . 17 fire sockets . 1 power connection . static and dynamic tests |
2014 | Porte d’Orléans | RATP | RATP | - Supply and installation of a dry riser inside a tunnel |
2013 | Station de Saumure CESAM | SFTRF | SFTRF | - Modification and equipment of the brine station |
2013 | Gare de Noisy le Grand Mont d’Est | RATP | RATP | - Supply and installation of 130 line meters of dry risers DN100 inside a tunnel on service and working nights . 4 fire sockets . 1 power connection . static and dynamic tests |
2013 | Reunion Island | EDF | EDF | - Manufacture of a G4 refrigeration exchanger (power station, Reunion Island) |
2013 | Wastewater storage structure PEP Front Populaire PEP Gardinoux PEP Autoroute A1 | RATP | RATP | - Supply and installation of hydraulics and electrics pieces of equipment of 3 exhaustion structures (PEP Front Populaire, Gardinoux & Autoroute A1) |
2011 | Tunnel du Sinard | AREA | AREA | - Supply and installation of 4x12 line meters of inter-tube dry risers |
2011 | Paris – Gare de Lyon | SNCF G & C | SNCF | - Ice water supply . removal of existing facilities . chilled water distribution . ice-water sub-station |
2011 | Tunnel de Nogent | DIRIF | SETEC TPI | - Supply and installation of 300 line meters of dry risers (emergency exit) - Supply and installation of 12 exterior fittings and 25 nipples (emergency exit) |
2010 | Station de Saumure Aix Nord | AREA | AREA | - Modification and equipment of the brine station |
2008 | Tranchée couverte de Mazagran-Doret – St Denis de la Réunion | Région Réunon | DDE La Réunion | - Supply and installation of pieces of equipment inside firefighting booths (fire hydrant + dry risers nipples) |
2017-20xx | Tunnel de Baza | DIR Massif Central | CLEMESSY | - Design, supply and installation of: . HCM 120 doors, CN60 and galvanized material . 60 line meters of hand rail . 20m² of metal floor |
2016-20xx | Tunnel de Bobigny | DIRIF | NGE GENIE CIVIL | - Renewal of the Bobigny tunnel and work on the Lumen and Norton roofs . supply and installation of 117 fire proof doors including level 2 fire doors, stainless steel glazed doors |
2017 | Tunnel du Fréjus | SFTRF | HODAPP | - Supply of 8 fire dampers and 8 insulation registers |
2016-2017 | Voierie Souterraine des Halles (Paris) | SEMPARISEINE | SOGEA TPI | - Construction of the fireproof mold (2hrs) of the permanent staircase and escalators between S1/RD levels, in 2 faces, made of plaster and metal frame - Area: 110m² |
2016-2017 | Tunnel d’Orelle – A43 Maurienne | SFTRF | EIFFAGE GENIE CIVIL | - Removal, supply and installation of 8 fireproof doors (2hrs) in tunnel - Removal of 2 doors and sealing of the stairwell - Installation of 2 separating walls including the frame for the gate |
2016 | Tunnels Guy Moquet & du Moulin | DRIEA IF | BOUYGUES TRAVAUX PUBLICS | - Supply and installation of emergency doors: . 4 fireproof doors (stainless steel) HCM 120, 1 leaf) . 7 metal doors units (EI120-60) . 11 airtight connecting doors . 11 outer secure doors |
2016 | Tunnel de St Béat | Ministère de l’Ecologie du Développement durable et de l’Energie | Ministère de l’Ecologie du Développement durable et de l’Energie | - Supply and installation of doors: . 14 stainless steel glazed doors for safety niches . 9 fireproof doors CN60 for technical and discharged niches . 2 fireproof doors CN60 for tunnels . 4 stainless steel doors for emergency galleries . 10 fireproof doors N1 made of galvanised doors |
2015-2016 | RN7 – Tunnel d’Orly | DIRIF | SEGEX | - Supply and installation of: . 10 doors with a single swing access 0.90 x 2.00 . 10 doors with a double swing access 1.10 x 2.00 . 2 access doors . 2 HCM doors . 6 doors with double assymetrical swing access . 4 doors with double symmetrical access . 1 door with single swing access |
2015 | La Coche | EDF SA – DPIH | EDF SA – DPIH | - Supply of a fireproof rated wall |
2015 | Usine Trimet | TRIMET | TRIMET | - Extension of the suction tube (anode baking furnace) |
2015 | Tunnel du Fréjus | GEIE GEF | IFOPSE | - Change made to the fire simulator fire (replacement of outer sheets) |
2015 | Chantier ICEDA/RAZEL | EDF CIDEN | BOUYGUES CONSTRUCTION | - Supply and installation of ducts support systems in storage halls (AN232 & AN233) |
2014-2015 | Tunnel de Dullin | AREA | AREA | - Supply and installation of: . 1 PLT EI120 door . 1 HCM 120 door . modification and security of the P2 room |
2014-2015 | Chatelet les Halles Zone Berger | RATP | RATP | - Supply and installation of systems support rails (“Halfen” type) |
2014-2015 | Metro extension line 12 (Station Gardinoux) | RATP | RATP | - Supply and installation of various metalwork elements for temporary tunnel ventilation in the construction phase - Compliance tests and repair emergency exit winches, hatches repair and various metal works |
2014-2015 | Tunnel du Mont Blanc | GEIE – TMB | GEIE – TMB | - Supply and installation of a stainless steel metal casing to permanent closure of an old chimney (smoke extraction duct) |
2014-2015 | Tunnel de Vuache | ATMB | ATMB | - Supply and installation of: . 2 alumininum guard rails . 1 stainless steel guard rail . extension of 2 ariadne’s threads at the inter-tube entrances . extension of 2 dry risers |
2014-2015 | Gare de Nogent sur Marne | DIRIF | Groupement Urbaine de Travaux – NGE | - Supply and installation of: . metal cladding . caged ladders . expanded metal fence . gateway |
2014-2015 | Tunnel sous Fourvière | Grand Lyon | INGEROP/SAFEGE/HGM | - Supply and installation of: . 2 level 2 doors |
2014-2015 | Tunnels de Chavants et Chatelard | ATMB | ATMB | - Supply and installation of 1 HCM 120 door and 1 CN120 door |
2014 | Tunnel des Monts | DIR-CE SREI DE SAVOIE | DIR-CE SREI DE SAVOIE | - Supply and installation of a safety niche top with lights and fittings |
2014 | Noisy le Grand – Pôle Multimodal | RATP | RATP | - Roof access and security, supply and installation of lifelines and fall protection systems (200 linear meters) and 2 access ladders |
2013 | Tunnel des Monts | DIR-CE SREI DE SAVOIE | DIR-CE SREI DE SAVOIE | - Repair of a bypass totem - Supply and installation of a bypass totem - Repair of a security niche totem |
2013 | Traversée souterraine de Toulon Liaison A50/A57 | DREAL PACA | AXIMA SEITHA | - Supply and installation of metal separating walls . lxh 4400x4600 Pressure resistance 4000 Pa . lxh 4800x5200 Pressure resistance 1100 Pa . lxh 4900x2500 Pressure resistance 1500 Pa . lxh 4700x4600 Pressure resistance 4000 Pa |
2013 | Porte des Lilas | RATP | RATP | - Supply and installation of a monorail 3.5t lg 4.5m |
2013 | Traversée souterraine de Toulon Liaison A50/A57 | DREAL PACA | AXIMA SEITHA | - Supply and installation of non-fire door units . 37 1V glazed niches doors with or without transom . 8 stainless steel 1V or 2V doors |
2012.-2013 | Chambre d’atomisation | Poudres d’Hermillon | Poudres d’Hermillon | - Production, installation and tests of an atomisation chamber (20t) - Installation of an oil cooling system for an atomising chamber (pumps, filters, dearator, expansion vessel, refrigerant unit) |
2012.-2013 | Gare de Noisy le Grand Mont d’Est | RATP | RATP | - Production and installation of 2 rainwater retention tanks made of PRV 3.6X8.6 + PRV guardrail - Manufacture and installation of a support structure for the tanks (7t) - Manufacture of a ventilation grid (8.2mx9.4m) on the ground and an access by a hatch with vertical caged ladder |
2012-2013 | Tunnels de Nice A8 | Escota – M Lyon | Escota – M Lyon | - Production and installation of 18 PAU acoustic booths (incl. 1 prototype) |
2012 | Tunnel des Chavants – Chatelard | ATMB | ATMB | - Continuity of the life line (security niches and evacuation gallery -50 linear meters) |
2012 | Tunnel de Thiais – A86 | DIRIF Ile de France | DIRIF Ile de France | - Supply and installation of 15 HCM120 2V fireproof doors (PL 1900x2000 to 2400x2000) |
2012 | Tunnel du Prado Sud – Marseille | Société Prado Sud | SETEC TPI | - Subcontractor of Eiffage Energie - Supply and installation of: . 1 road access door (2V 1.4x2) . 2 safety niches glazed doors (1V 0.9x2) . 4 fire doors (CF120 2V) - Meters of guardrails and handrails |
2012 | Tunnel des Monts | DIR-CE SREI DE SAVOIE | DIR-CE SREI DE SAVOIE | - Supply and installation of a totem |
2011-2012 | Marseille Metro | Régie de Transports de Marseille | SPIE SUD-EST | - Supply and installation of: . 8 glazed gates with a firefighter access 1700 PL 1500 . 5 glazed gates with a firefighter access 1250 PL 1050 |
2011-2012 | Tunnel de Ponserand – RN 90 | DIR Centre Est | DIR Centre Est | - Subcontractor of ETDE - Supply and installation of: . 7 safety niches glazed doors PL 900 x 2100 . 1 access door to the gallery (2V PL 3500 x 3500) Installation of: . 7 fireproof doors (Technical Room) . 1 HCM door |
2011 | Tunnel de Castillon – RD2566A | Conseil Général Alpes Maritime | Conseil Général Alpes Maritime | - Supply and installation of 2 fireproof doors (HCM120 N2 2PV PL 1400x2000) |
2010-2011 | Tunnel de Joliette - Marseille | Communauté urbaine de Marseille Provence Métropole | Acadis – Egis – Mascarelli | - Subcontractor of SPIE SUD EST - Supply and installation of: . 15 2V galvanised doors . 2 access stainless steel fireproof doors (1V type F112) . 1 galvanised door (1V PL 790 x 2022) . 2 galvanised doors (2V PL 1440 x 2346) . 1 wire-mesh galvanised door (1V PL 843 x 2100 . 6 fireproof stainless steel doors (1V F112) . 6 galvanised double doors (2V PL 1650 x 1990) . 8 stainless steel doors (1V PL 890 x 1985) - Installation of air conditioning and ventilation (Technical Room) |
2010 | Pont de l’Echaillon à St Jean de Mne | SFTRF | SFTRF | - Reinforcement network supports (166 galvanized flat iron clamps) |
2010 | Ventilation auxiliaire des usines souterraines B et C du Tunnel du Fréjus | SFTRF | Lombardi SA | - Dismantling - Manufacture and installation of: 1 platform + access ladders (+Ndc), caged ladders, guard rails, sliding hatches, 2 HCM fire dampers - Supply and installation of a CN120 stainless steel door |
2009 | Tunnel d’Orelle – A43 Maurienne | SFTRF | Egis Tunnels | - Subcontractor Ansaldo - Supply and installation of 3 fireproof doors (1.1x2.1) - Installation of a ventilation duct - Installation of 9 dampers (1.2x1 to 2.5x2.8) - Setting up installation procedures |
2009 | Tunnel de Brotteaux Servient – Lyon | Communauté urbaine du Grand Lyon | Bonnard & Gardel Ingénieurs Conseils | - Member Companies: Spie Sud Est –Snef – GFC – Maïa Sonnier – Yvroud - Supply and installation of: . 4 fireproof doors level 3 0.9x2 . 3 fireproof doors level 3 2x2.5 2V - Manufacture and installation of: . 4 safety niches . 3 HCM fire dampers (500x450) . 3 ceiling anchorage rings (+NdC) . 1 deflector (+NdC) |
2009 | Tunnel de l’Escalette | DIR Massif Central | DIR Massif Central | - Member Companies: Spie Sud Ouest – Yvroud - Lacroix - Supply and installation of 6 fireproof doors (HCM 120 2V 1.4x2 and 900 linear meters of stainless lifelines) - Manufacture and installation of 6 bypass fan frames and 6 HCM120 400x500 fire dampers |
2009 | Route des Tamarins | Région Réunion | DDE La Réunion | - Subcontractor Member Companies: Cenergi/Spie/Enfrasys/Bourbon Lumière - Production of: . 13 painted stainless steel safety niches doors . 13 stainless steel metallic grating floor . 7 painted stainless steel doors (Technical Room) . 40 painted stainless steel reservation sheets . 18 stainless steel rail hatches (1x1) . 6 ceiling anchorage rings + fastenings . 2 stainless steel grids (3x1.6 and 0.9x1.6) . 1 cone top chimney cap - Supply and installation of: . 1 painted stainless steel HCM120 door (2x2.2 2V) . 2 access ladders to the reservoirs |
2007-2013 | Tunnels de Nice A8 – 15 tunnels | ESCOTA | SETEC TPI NICE | - Production and supply of: . 92 safety niches doors + stainless steel metallic covering . 2 technical room doors . 2 4x4 large doors - Supply and installation of: . 20 level 3 fireproof doors (1.9x2.15) . 6+2+3 HCM 120 fireproof doors (1.4x2.15x2.2 and 1.2x2.1) . 2 HCM120 4x3.5 large fireproof doors . 2+2 CN210 fireproof doors (1.4x2 and 0.9x2) . 40 CN120 fireproof doors (1.9x2) |
2007-2008 | Tunnel Maurice Lemaire | APRR | EGIS Tunnels | - Supply and installation of: . 16 ISO fireproof doors (0.9x2.1) . 16 ISO fireproof doors (0.9x2) . 10 ISO fireproof doors (0.9x1.8) . 16 ISO fireproof doors (0.9+0.45)x2.1 2V . 16 HCM120 fireproof doors (0.9x2.1) . 16 ISO fireproof doors (1.75x1.1) 2V . 16 ISO fireproof doors (1x0.9) . 10 level 3 fireproof doors (1.8x2.1) 2V . 77 emergency cabinets . 2 access ladders to the settling ponds - Supply and installation of: . 64 stainless steel soundproof glazed safety niches doors . 16 1x1 hatches with access ladders . 13 stainless steel emergency cabinet bases . 4 louvre grids for the settling ponds . 4 stainless steel bypass large doors 3.4x2.5 (2V+P) with pressure flap . 2 stainless steel gallery access large doors 3.2x2.9 (2V+P) . 4 stainless steel technical room doors (0.9x2) . 1 gateway with stairs (+NdC) . guardrail . booster room grating floor |
2007-2008 | Tunnel d’Angers | COFIROUTE | SCAO/SOCASO | - Supply and installation of: . 36 shutters . 30 safety niches doors . 16 fire niches unites (grating and access ladder) . 16 emergency exit doors . 16 handrail units + guardrails (emergency exit) . 3 caged ladders + closing hatch . 6 metal stairs . 6 removable separating walls + 1x2 door . 9 communicating doors 0.9x2 . 18 + 3 technical rooms doors (1.4x2 and 0.9x2) - Supply and installation of: . 2 large HCM fire doors (3.5x3.5) . 32 CN120 fire emergency doors (0.9x2) |
2008 | Tunnel d’Orelle – A43 Maurienne | SFTRF | SNA | - Supply and installation of 1 large HCM120 fireproof door (3x3.5m 2V+P) |
2008 | Tranchée couverte de Mazagran-Doret St Denis de la Réunion | Région Réunion | - Member Companies: Clemessy – IEM – Thorn - Yvroud - Manufacture and installation of: . 4 painted stainless steel safety niches doors . 4 stainless steel metallic grating floor . 3 painted stainless steel doors (Technical Room) . 132 painted stainless steel reservation sheets (0.5x0.3 and 0.5x0.2) . 4 stainless steel draft chambers hatches (1.2x1) - Supply and installation of: . 5 painted stainless steel grids (0.8x0.6) and 1 of 1.5x1.2 | - Member Companies: Clemessy – IEM – Thorn - Yvroud - Manufacture and installation of: . 4 painted stainless steel safety niches doors . 4 stainless steel metallic grating floor . 3 painted stainless steel doors (Technical Room) . 132 painted stainless steel reservation sheets (0.5x0.3 and 0.5x0.2) . 4 stainless steel draft chambers hatches (1.2x1) - Supply and installation of: . 5 painted stainless steel grids (0.8x0.6) and 1 of 1.5x1.2 |
2008 | Métro de la Soie | SYTRAL | SYSTRA | - Manufacture and installation of 730 linear meters of sidewalks, stairs, 3000 linear meters of handrails, guardrails, protection grids, ventilation grids (21m² and 30m²) |
2007 | Traversée souterraine de Toulon (2nd tube du tunnel routier sud) Liaison ASO/A57 | Ministère des Transports, de l’Equipement du Tourisme et de la Mer | SETEC TPI/TERRASOR | - Subcontractor of Soletanche Bachy - Supply and installation of 1 large CF 2V+P fireproof door (6.15x3.8) |
2007 | Maquettage du Tunnel de Thiais | DIRIF | Groupement ISIS-SEGIC Ingénierie | - Supply and installation of 1 HCM 1V door. Draft of the panic bar. Manufacture and installation of an outer emergency exit door |
2007 | Tunnel de la Baume A51 | Escota | Ingerop | - Supply and installation of 2 HCM 1.4x2 doors |
2007 | Bure | Laboratoire de recherche souterrain de Meuse/Haute Marne | - Subcontractor of Vinci Construction Grands Projets - Supply and installation of: . 1 fireproof door (1V 0.9x2.1) . 1 fireproof door (2V 3.6x4.4) . 1 fireproof door (2V 3.12x3.86) . 2 louvre blades 6x4.2 . 14 glazed frames 1.2x1.8 or 3x1.2 |
|
2017-20xx | Tunnel de Caluire | LEONORD | EIFFAGE ENERGIE THERMIE CE | - Installation of 41 tunnel accelerators and ventilation equipment in ventilation plants (4 large fans) - Design and manufacture of blades and aeraulics connection parts |
2016-20xx | Ventilation Work RATP Métro & RER | RATP | RATP | - Creation, reinforcement and renewal of the Metro and RER’s tunnel ventilation - Contract for 2 works - Yvroud’s job: electromechanical equipment (fans with manual brake + accessories, metal ducts, blades, acoustic baffles, fire dampers) . Removal of the current system . Design, supply and installation of new equipment . Tests and commissioning |
2016-20xx | Projet L14 ASE Adjustment of existing stations | RATP | RATP | - Lot T11: HVAC works, fluids and smoke extraction - Design, supply and installation of the mechanical smoke evacuation pieces of equipment (motor-fan units for smoke extraction, acoustic baffles, isolation dampers) - Design, supply and installation of fire fighting installations (dry risers, water extinguishing system, alarm and control equipment) - Design, supply and installation of equipment for air conditioning and air treatment (galvanised steel ducts, dampers, CF 2h fireproof ducts, duct fans, air conditioning unit, air handling unit and extractor) |
2016-20xx | Tunnel du Fréjus | GEIE GEF | GEIE GEF | - Replacement of the ventilation system inside the tunnel plans: . Installation of fans . Design, manufacture and installation of ventilation ducts and other related equipment . Design, supply and installation of CN120 doors . Design, supply and installation of planking and access hatches (CN120) |
2016-2017 | Tunnel de St Béat RN125 diversion from St Béat to Arlos | Ministère de l’Ecologie, du Développement durable et de l’Energie | Ministère de l’Ecologie, du Développement durable et de l’Energie | - Design, supply and installation of a ventilation system (Plants, technical room and gallery) - Supply and installation of isolation dampers, control damper, cool air vents - Supply, installation and tests of smoke dampers - Supply, installation and tests of atmospheric sensor (CO, NO2, opacimeters, anemometers) - Supply, installation and tests of fans inside the gallery - Supply and installation of CN60 fire dampers and fire balancing dampers |
2016 | Tunnel de Caluire | LEONORD | EIFFAGE ENERGIE THERMIE CE | - Design, supply and installation of guided blades |
2016 | Station Métro Ligne A des Cordeliers Local LVT | SYTRAL | SYTRAL | - Refurbishment of the smoke evacuation soundproofing - Design, supply, removal and installation of acoustic baffles - Acoustic tests |
2016 | Tunnel de Saint Germaine n Laye Creation of the 5th exit of the tunnel | SANEF | SATELEC FAYAT | - Design, supply, installation, commissioning and tests of metalwork and ventilation equipment: . 2 HCM doors . 2 fans . 2 volume control damper/closing . 4 HCM120 fire protection devices . 2 motorised closing dampers of the fan unit |
2016 | Seine Aval Water treatment Plant Achères | SIAAP | NGE GENIE CIVIL | - Design, supply and installation of ventilation grids (weather protection and intumescent grids) |
2015-20xx | Villiers sur Marne Water storage reservoir « la Bonne Eau » | Département Val de Marne | TTI | - Design, supply, installation and commissioning of ventilation equipment |
2015-2017 | Ouvrages de ventilation RATP Métro et RER | RATP | RATP | - Creation, reinforcement and renewal of the Metro and RER’s tunnel ventilation - Contract for 3 works - Yvroud’s job: electromechanical equipment (fans with manual brake + accessories, metal ducts, blades, acoustic baffles, fire dampers) . Removal of the current system . Design, supply and installation of new equipment . Tests and commissioning |
2015-2016 | Station Métro ligne 1 Puteaux 2 dans le tunnel de l’Autoroute A14 | RATP | RATP | - Renewal of the fire protection ventilation duct: . removal of steel duct and existing support systems . installation of a new steel duct made of sand-lime material and its support systems (on site assembly) . design and manufacturing studies . fire test in the laboratory |
2015-2016 | Centrale hydroélectrique de Veytaux | GIHLEM | EIFFAGE ENERGIE THERMIE CE | - Manufacturing studies - Supply and installation of fireproof ducts (EI120) - Supply and installation of metal ducts - Supply and installation of metal frames - Installation of fans and dampers |
2015 | Ligne 12 | RATP | RATP | - Moving and restoration of the temporary ventilation system |
2015 | Station Porte des Lilas Ligne L3bis | RATP | RATP | - Design, supply and installation of a smoke extraction ventilation network: . supply and installation of a smoke extraction fan . supply and installation of a smoke extraction duct . supply and installation of steel duct . supply and installation of 2H self-controlled fire dampers |
2015 | Tunnel de l’Epine et de Dullin Autoroute A43 | AREA | AREA | - Removal and installation of 3 tunnel accelerators |
2014-20XX | Gare souterraine de Paris Nord | SNCF | SNCF | - Paris Gare du Nord underground station (north side): replacement of 3 fans: design, supply, installation, commissioning and tests |
2014-2017 | Ouvrages de ventilation RAPT Métro & RER | RATP | RATP | - Creation, reinforcement and renewal of the Metro and RER’s tunnel ventilation - Contract for 11 works - Yvroud’s job: electromechanical equipment (fans with manual brake + accessories, metal ducts, blades, acoustic baffles, fire dampers) . Removal of the current system . Design, supply and installation of new equipment . Tests and commissioning |
2014-2016 | Centrale du Bugey 1 | EDF CIDEN | DCNS | - Bugey 1 Power Plant: prefabrication and assembly of ducts and ventilation equipment in order to make safe dismantling operations |
2014-2015 | Station Métro Ligne 1 Puteaux 1 dans le tunnel de l’Autoroute A14 | RATP | RATP | - Renewal of the fire protection ventilation duct: . removal of the steel duct and existing support systems . installation of a new steel duct made of sand-lime material and its support systems (on site assembly) |
2014-2015 | Tunnel sous Fourvière | GRAND LYON | INGEROP/SAFEGE/HGM | - Ventilation Studies - Specific study PID implementation - Preliminary tests (south tube ventilation) - Specific tests for PID implementation - Tests prior to implementation - OPR tests and PC Comet on site - Supply, installation, commissioning and testing: . 16 accelerators (+ temperature and vibration probes) . 32 air deflectors . atmosphere sensors (8 NO2 sensors, 2 NO2 analysers-transmitters, 20 anemometers and 20 thermometers) . 36 smoke evacuation hatches + 4 equipment hatches |
2014-2015 | Tunnels de Chavant et du Chatelard | ATMB | ATMB | - Design, supply, installation, commissioning and testing: . HCM and discharge fire dampers . emergency gallery fan (15kW) . 8 ventilation dampers (manual and motorised) for the technical rooms . atmosphere sensors (NO2 sensors, opacimeters) |
2014 | Tunnel du Mont Blanc | GEIE – TMB | GEIE – TMB | - Supply and installation of supplies necessary for the recovery and complete achievement of the operation, of the smoke extraction installations of the North ventilation plants . study, supply and installation of extraction turrets . replacement of the associated protection devices . rework of the fresh air duct . supply and installation of 4 louver shutters . ventilation control . supply and installation of grids |
2014 | Tunnels d’Uriol et de Petit Brion Autoroute A51 | AREA | AREA | - Review of 17 accelerators: design, removal, audit, fixing, anchorage inspection - Testing and commissioning - Day or night work - tunnel in operation |
Workshop
Year | Project Name | Final Customer | Project Owner | Main features |
Maintenance
Year | Project Name | Final Customer | Project Owner | Main features |
---|---|---|---|---|
2017 | Gare de Paris Montparnasse | SNCF | SNCF | - Dry fire pipes annual maintenance |
2016 | Voie Ballast RER A | RATP | RATP | - Cleaning, maintenance and assessment of 8 tunnel ventilation works: . preventative and curative maintenance . cleaning . maintenance and fans’ assessment . installation of electromechanical pieces of equipment . technical and operational tests prior to reception |
2015-2016 | Tunnel de Talant | Direction Interdépartementale des Routes Centre Est | Direction Interdépartementale des Routes Centre Est | - Ventilation - Maintenance of accelerators, overpressure of inter-tubes or evacuation galleries, atmospheric sensors - Metalwork Maintenance of tunnel fire doors |
2014-2015 | Tunnel de Gometz la Ville | Conseil Général Essone | Conseil Général Essone | - Fire pipe - Maintenance of valves, suction pads, fire fittings, boosters, surge control systems, pumping units |
2014-2015 | Station Gardinoux (Aubervillers) | SYSTRA | RATP | - Electromechanical maintenance of fans: . Work on motor-fan units . Check of power and control circuits . Control of additional pieces of equipment |
2013-20xx | Tunnels des Monts, du Siaix, du Ponserand et du Rond-Point | DIR Centre Est – SREI Chambéry – District de Chambéry | DIR Centre Est – SREI Chambéry – District de Chambéry | - Ventilation - Maintenance of accelerators, fans, inter-tubes overpressure, atmospheric sensors - Metalwork - Maintenance of tunnel fire doors, and safety recess doors |
2013-20xx | Tunnels du Sinard, de l’Epine, de Dullin, du Mont-Sion, d’Uriol et de Petit-Brion | AREA | AREA | - Ventilation - Maintenance of accelerators - Metalwork - Maintenance of tunnel inter-tubes fire doors, safety recess and technical room doors - Additional work - Service of accelerators (Uriol & Petit-Brion tunnels) |
2013 | Tunnel A14 | SEA 14 | SEA 14 | - Control and service of 12 accelerators - Vibration tests and commissioning - Night work - Tunnel in operation |
2011-20xx | Tunnels du Lioran & de Baza | DIR Massif Central | DIR Massif Central | - Ventilation - Maintenance of fans, dampers, soundproof systems, atmospheric sensors, smoke extraction hatches, sanitary ventilation, technical rooms ventilation, ventilation of airlock room emergency galleries - Metalwork - Maintenance of tunnel fire doors, safety recess and technical room doors - Fire pipe - Maintenance of fire hydrants, valves |
2011-2012 | Tunnel de Dullin | AREA Direction Technique et Viabilité | AREA Direction Technique et Viabilité | - Service of 69 accelerators: removal, service, refitting, checking of anchorages - Vibration tests and commissioning - Night work - Tunnel in operation |
2011-2012 | Tunnel du Mont Blanc (Chamonix) | GEIE - TMB | GEIE – TMB | - Removal, service and refitting of 76 accelerators (diameter 710) - Achievement of anchorages - Vibration tests and commissioning - Night work - Tunnel in operation (closed for 2 hours) |
2010-2013 | Tunnel sous Fourvière (TSF), Tunnel de Croix Rousse (TCR), Tunnel Brotteaux Servient (TBS), Tunnel Vivier Merle (TVM), Dépose Minute Part Dieu (DMPD) | Grand Lyon | Grand Lyon | - Ventilation - Maintenance of fans, dampers, shutters, atmospheric sensors, smoke extraction hatches, inter-tubes overpressure, overpressure of technical doors - Metalwork - Maintenance of tunnel inter-tubes fire doors, safety recess doors, technical rooms doors |
2009-20xx | Tunnels de l’Autoroute A8 (Nice à Menton) | ESCOTA | ESCOTA | - Ventilation - Maintenance of accelerators, atmospheric sensors, inter-tubes overpressure, overpressure of recess rooms - Metalwork - Maintenance of tunnel inter-tubes fire doors, safety recess and technical room doors |
2009-20xx | Tranchée couverte contournement Nord d’Angers | COFIROUTE | COFIROUTE | - Ventilation - Maintenance of accelerators, fans, shutters - Metalwork - Maintenance of inter-tubes tunnel fire doors, safety recess and technical room doors - Fire pipe - Maintenance of fire hydrants, valves, overpressure, surge control tank |
2009-20xx | Systèmes de ventilation des puits RATP & RER | RATP (Département des Espaces et du Patrimoine) | RATP (Département des Espaces et du Patrimoine) | - Ventilation - Maintenance of motor-fan units, access hatches, fire dampers, acoustic baffles, lighting, power and control circuits |
2009-2015 | Tunnels d’Orelle, Aiguebelle, Hurtières et Tranchée couverte de Ste Marie de Cuines | SFTRF | SFTRF | - Ventilation - Maintenance of accelerators, fans, inter-tubes overpressure, atmospheric sensors - Metalwork - Maintenance of tunnel inter-tubes fire doors, safety recess doors and technical room doors - Fire pipe - Maintenance of fire hydrants, nipples, suction pads, electric pump units, manual valves with or without position sensors, surge control systems, float level switches, hydrometric probes, strainers, heating cables |
2008-20xx | Tunnels du Vuache, des Chavants et du Chatelard | ATMB | ATMB | - Ventilation - Maintenance of accelerators, inter-tubes overpressure, atmospheric sensors - Metalwork - Maintenance of tunnel fire doors, safety recess doors - Fire pipe - Maintenance of fire hydrants, nipples, suction pads, electric pump units, manual valves with or without position sensors, pressure relief systems, surge control systems, float level switches, hydrometric probes, inlet filters, heating cables, dry fire pipes |
2015-20xx | Site Seine Amont Malfourches | SIAAP | SETHA | - Supply and installation of pieces of equipment and piping for ventilation of premises |
2015-2016 | Site Seine Amont Argenteuil Clichy | SIAAP | SETHA | - Supply and installation of pieces of equipment and piping for ventilation of premises |
2016 | SIAAP Usine de Achères Piping system maintenance | SIAAP ACHERES | EITEM | - Connection of 2 tanks made of HDPE exhaust airØ200 |
2016 | SIAAP Usine de Achères Piping system maintenance | SIAAP ACHERES | EITEM | - Refurbishment of 14 weld beads on HDPE tubes |
2016 | SIAAP Usine de Colombes Piping system maintenance | SIAAP COLOMBES | SOGEA IDF Hydraulique | - Installation of ducts (SPID premises) |
2016 | SIAAP Usine de Colombes | SIAAP Colombes | SOGEA IDF Hydraulique | - Air renewal of the SICK Room (prickingof fresh air diameter 200) |
2016 | SIAAP Usine de Achères | SIAAP Achères | EITEM | - Installation of a discharge valve to secure the stale air network |
2016 | SIAAP Charenton | SIAAP | SETHA | - Set up of a dehumidifier |
2016 | SIAAP Usine de Achères | SIAAP Achères | EITEM | - Refurbishment of 3 weld beads on HDPE tubes |
2016 | SIAAP Usine de Colombes | SIAAP Colombes | EITEM | - Alignment of the aluminum duct (Room C2), including installation of a new fire damper |
2016 | CAA 31 | SIAAP | SADE CGTH | - Supply and installation of deodorising ventilation pieces of equipment and airflow networks . design study . removal of the current pieces of equipment (duct, tank, etc.) . set up of air fresh duct (Ø 500 to 125), plenum |
2015 | SIAAP Seine Aval | SIAAP | EI Tuyauterie Electromécanique | - Supply and installation of a ventilation system: . site survey with on-site reading . creation of airflow calculation notes and implementation plan - Sizing and installation, including: . 1 dust extraction unit (5000 m3/h) . 1 hood (Ø 300mm) with articulated bracket . 1 network of smooth ducts with fallen edges (Ø 350) . 1 barrel sand dust recovery (100l) . 1 set of compressed air with solenoid valves . 1 electrical control cabinet . 1 sequencer - Commissioning, testing and adjustments |
2015 | SIAAP | SETHA | - Implementation of desodorisation: . study of installations with on-site reading . creation of airflow calculation notes and implementation plan . supply and installation of 2 fans (insufflation and extraction) . supply and installation of a desodorisation chamber . supply and installation of various grids . supply and installation of air duct networks |
|
2014 | Emissaire VL9 | SIAAP DGT | - Study and installation of a ventilation system and deodorisation . technical room equipment (deodorisation chamber, fan, motorised damper, sensors O2CO CH4 H2S decompression valve) - Equipment of 4 wells (P1, P2, P3 & P4) : sensors O2CO CH4 H2S - Testing, control, and reception of all the ventilation pieces of equipment |
HVAC
Year | Project Name | Final Customer | Project Owner | Main features |
---|---|---|---|---|
2015 | Chalets « EIGER - MÖNCH - JUNGFRAU » Courchevel 1550 | CBC (Duingt) | Groupement SPIE Batignolles | - Supply of a wood boiler (pellets) – 50kW - brand: Hertz |
2014 | DEAT La Roche sur Foron | GCC Rhône Alpes | - Individual and collective housing (66 flats + 23 villas): - Supply of 2 wood boilers (pellets) – 250kW – brand: Hertz |
|
2014 | Nature & Sens Echenevex | SCI Echenevex Village - Nexity | Atelier Thierry Roche & Associés | - Individual and collective housing (66 flats + 23 villas): - Supply of 2 wood boilers (pellets) – 250kW – brand: Hertz |